Setting Out
Robotic-total-station setting out for piling rigs, kicker frames, MEP risers and structural steel — typically held to ±2 mm of design coordinates on every floor.
- Primary control to OSGB36 / OSTN15
- Verticality control on high-rise cores
- Daily as-built verification